THE APPLICATION CASE

THE APPLICATION CASE

SELECT THE MOST SUITABLE AND SAFE UNITS FOR THE CUSTOMERS' PROJECTS

Application case of natural gas drilling in oil fi


Sinopec Gas field Drilling Application Project

Project Site:

Sinopec Wushen Gas field,Inner Mongolia,China

Project Genset:

AMICO 810kw Natural Gas Power Unit + AMICO 750kW Natural Gas Genset

Project Background:

To reduce drilling costs and pollution, our customer desired to adopt AMICO natural gas gensets to replace the original diesel gensets.

Project Introduction:

2 × 810kW AMICO natural gas power unit + 1 × 750Kw AMICO natural gas genset supply prime power for the mechanical drilling platform, cooling cycle system & other auxiliary production system.

Benefit Analysis:

It is understood that the drilling crew will consume around 160 to 180 ton diesel or 200,000 to 240,000 cubic meter natural gas for each gas well. In the local market,the price is around US$1,100 per ton for the diesel and US$0.40 per cubic meter for the natural gas.The drilling crew can save around US$96,000 to US$102,000 after the AMICO natural gas genset were adopted.